Complete IW2250 Interactive Whiteboard Eboard Multi-touch Bundle

R39,557.29 ex. Vat | R45,490.88 incl.VAT

This bundle includes the following:

 

  • 1 x IW2250 Interactive Whiteboard Eboard Multit (2320*1434mm) Price (R23 084.34) (includes Twelve Month Product Training Voucher)
  • 1x OP0452A DLP XGA Projector (Price R9 444.34)
  • 1 x OP0300 Ceiling Mounting Bracket for projector Price (R394.77)
  • 1 x Parrot Speaker sound bar (R1078.25)
  • Cables and Accessories (Price R2 555.60)*
  • Installation (Price R3 000.00) **
  • Total value of system: R 39 557, 29 ex VAT

 

*Please note that the amounts for the cables and accessories is only an estimation and may change depending on your requirements. Please contact us should you require a site inspection.

** Installation prices may change if you are located in an outlying area. Certain outlying area may need to include travel and accommodation depending on the area, please contact us to verify this.

 

 

Description

Features of  IW2550:

  • 14 Buttons on both sides.
  • Multi-touch – Owing to the multi-touch capabilities of the Parrot eBoard Multi-Touch, 2 users are able to operate simultaneously, using either their fingers or Stylus E-pens to write, perform mouse functions, erase and manipulate objects.
  • Supports Parrot Product Whiteboard Markers in the event of power failures.
  • Whiteboard Markers can be erased with a damp cloth or Parrot cleaning fluid.
  • Multi-gesture recognition makes for easier operation.
  • Compatible with: Windows / Ubuntu/ Linux/ MacOS/ Debian/ Linkat
  • No possibility of lighting interference.
  • 3 Year Warranty.
  • Includes 8m USB Cable. (Power Supplied via USB Cable)
  • Full HDMI quality.
  • Aspect Ratio 4:3
  • CPU: 2.1 Ghz or higher.
  • HDD: 1 Gb free hard disk space for installation.
  • RAM: 1Gb or higher.
  • Output: HDMI/VGA/USB

 

Additional information

Availability

Please check stock availability before placing an order.

Kindly note: whiteboardshop.co.za will be closed from 22 December 2018 to 2 January 2019. All orders need to be received by 19 December 2018 to be processed this year Dismiss